Skip to content
AIColorado Solarby Discovery Clean Energy

EV Chargers × Black Hills

Charging an EV at Home on Black Hills Energy (Colorado Electric)

On Black Hills, the simplest win with an EV is pairing it with solar: Black Hills allows systems sized up to 200% of expected use, so you can build in the car’s load. We install Level 2 chargers for about $2,500–$3,000. The federal §30C charger credit ended June 30, 2026, and we haven’t confirmed a Black Hills home-charger rebate, so we don’t count on one.

Worth it for daily drivers; best paired with solar sized for the car.
01

Plan the solar around the car

A typical EV adds a few thousand kWh a year. Because Black Hills’ size cap is based on reasonable expected consumption, a new EV is a legitimate reason to size solar larger — keep the purchase paperwork handy in case the utility asks.

02

Charging schedule

Ask us to check which rate plan you’re on before you set a charging schedule. If Black Hills offers a time-based plan you qualify for, overnight charging is usually the cheapest; if you’re on a flat rate, the time matters less and convenience wins.

Utility type

Investor-owned utility

How exports are credited

Exports banked 1:1 as kWh credits

System size limit

Up to 200% of reasonable and expected annual consumption.

Net metering, in plain English

As an investor-owned utility, Black Hills follows Colorado’s full net-metering statute. Excess solar is added to your banked energy for future months, and the system can be sized to supply up to 200% of your reasonable expected annual use.

Sources & dated facts

  • Systems may be sized to supply no more than 200% of the customer’s reasonable and expected annual electricity consumption; excess energy is added to banked energy for future months.As of Sep 23, 2026 · source
  • Application fees: $380 for systems up to 25 kW AC; $760 for 25 kW to 1 MW.As of Sep 23, 2026 · source

FAQ

Questions we hear

Does Black Hills Energy give a rebate for a home EV charger?

We haven’t confirmed a current Black Hills home-charger rebate. Check its Colorado programs page before you buy; the federal §30C credit ended June 30, 2026.

Can I make my solar bigger because I bought an EV?

Black Hills sizes by reasonable expected consumption, up to 200%, so a new EV is a valid reason to plan more panels.

How much does a Level 2 charger install cost?

We typically install Level 2 chargers for about $2,500–$3,000, depending on the distance to your panel and whether it has room.

Get honest numbers for your roof

Our Colorado crew looks up your utility’s current rules, models your roof, and tells you straight — including when solar or a battery won’t pay off.

Call nowFree estimate