Colorado has opened the door to accessory dwelling units: Denver now allows them across most residential zones, and a 2024 state law (HB24-1152) requires many Front Range cities to permit them in single-family areas. That means a lot of homeowners are adding a second small house to the lot, and many of them are asking about solar at the same time. We install these systems, whether the panels go on the ADU roof, the main house or both. The first question is always the same: does the ADU have its own meter?

We install this
All-electric ADU usage
3,000–6,000 kWh/yr
heat pump, induction, HPWH; more with an EV
Array to offset it
2–4.5 kW
5–11 panels; fits most ADU roofs
Installed price
$2.80–$3.25/W
residential; small systems trend toward the high end
Panel footprint
~20 sq ft
per 400–440 W panel
01

One meter or two changes everything

If the ADU is fed from your main panel through a subpanel, it’s just another load on your meter. Solar anywhere on the lot offsets everything, and sizing is straightforward: add the ADU’s expected usage to yours and design for the total. This is the simplest and, for an owner-occupied ADU or family member, usually the best setup.

If the ADU has its own utility meter, which is common when it’s a rental, net metering is credited per meter. An array on the ADU roof tied to the ADU meter offsets only the ADU. An array on the main house offsets only the main house. Unless your utility allows aggregation of meters on one property, you can’t credit both from one array, and you’d need two separate interconnections to solar both.

That’s not a reason to skip solar; it’s a reason to decide the meter question before you pour the ADU foundation. A separately metered rental lets the tenant pay their own bill, but it also means the landlord’s solar can’t help with it. Some owners sub-meter the ADU privately instead: one utility meter, one array, and a lease that passes through a share of the electric cost. Whether that’s allowed depends on local landlord rules, so check them.

02

Sizing for a rented unit

A 600- to 900-square-foot all-electric ADU with a heat-pump mini-split, induction range and heat-pump water heater typically uses somewhere in the range of 3,000–6,000 kWh a year in Colorado, more if the tenant has an EV. That’s roughly a 2–4.5 kW array at 1,300–1,600 kWh per kW, which fits on most ADU roofs if a face points south or west.

A tenant’s habits are outside your control, so we size to a realistic average rather than a best case. If the ADU shares your meter, the array size is the combined total and the ADU is just part of it; if it’s separate, we design specifically for that meter and leave headroom for an EV charger, which more tenants ask about every year.

03

Building it in from the start

New ADU construction is the cheapest moment to prepare for solar. We ask the builder for a roof plane facing south or west with no plumbing vents in the middle of it, a conduit sleeve from the attic to the electrical panel, a panel with spare breaker space and a bus rated for backfeed, and a 240-volt circuit to the parking spot for a future charger. Each of those costs little during framing and a lot afterward.

Standing-seam metal on the ADU roof makes the array penetration-free and pairs well with the modern, flat-roofed or low-slope designs most Denver ADUs use. Low-slope roofs work with tilted racking; we just need parapet heights and drainage worked out with the architect. See our new-construction page for the full checklist.

04

Panels on the ADU, powering the main house

A common case: the main house is a 1920s bungalow with a hip roof full of dormers and a big silver maple over it, and the new ADU behind it has a clean, unshaded shed roof. When the ADU shares the house meter, we put the array on the ADU and run conduit to the main panel. Electrically it works exactly like a detached-garage array, and it often out-produces anything the old house roof could hold.

The reverse is also common: the ADU is tucked in the shade of the main house and the house roof is wide open. Then the house carries the panels and the ADU is simply a load. Either way, the rule is to put the array where the sun is and connect it to the meter that needs the offset.

What to do next

  1. 1Decide the meter question first: shared with the house, or a separate utility meter for the ADU.
  2. 2If you’re still designing the ADU, send us the plans; we mark up roof orientation, conduit and panel capacity.
  3. 3We model the ADU roof and main-house roof and place the array where it produces most.
  4. 4For a rental, we size to a realistic tenant load and leave room for an EV charger.
  5. 5We handle permits and interconnection for whichever meter the array serves.

Figures are honest ranges from our Colorado pricing and public data, not a quote. Utility rules and incentives change — we confirm the current ones before any design.

FAQ

Questions we hear

Can one solar array cover both the house and a separately metered ADU?

Generally not. Net metering credits the meter the array is connected to. Some utilities offer meter aggregation on the same property; most residential customers don’t have that option. If both meters need solar, that’s two interconnections, or a single shared meter.

Does solar on the ADU raise the rent I can charge?

Tenants do value a low or zero electric bill, and an all-electric ADU with solar is a real marketing point. We can’t tell you what your market will pay; we can tell you what the ADU’s expected bill looks like with and without the array.

Are ADUs actually allowed in my city?

Denver allows them in most residential zones, and HB24-1152 requires many Front Range municipalities to permit them in single-family zones as of mid-2025. Rules on size, parking and owner-occupancy still vary by city; check with your planning department before designing around one.

Is a small ADU-only array worth it?

Small systems cost more per watt and the federal residential credit is gone for systems placed in service after 2025, so a 2 kW array on its own meter has a longer payback than a 7 kW array on the house. It can still make sense for a long-term rental. We’ll show you the numbers rather than assume.

Can I add a battery for the ADU?

Yes, on whichever meter the battery serves. Colorado exempts residential batteries from state sales tax through 2032, and the 10% state income-tax credit on battery purchases applies for tax years through 2026 as of September 2026; confirm with your tax advisor.

Want it designed for your place?

Tell us what you’re powering and where. We’ll model it on your utility’s rules and say plainly whether it pencils.

Call nowFree estimate